UHS Palo Alto/Retama

San Antonio, Texas & Selma, Texas

Simultaneously delivered two identical hospitals on schedule.

A single set of unit types, designed with lead architect Marmon Mok, delivered concurrently to two identical hospitals running on separate schedules.

UHS Palo Alto / Retama

Durapods was given the unique opportunity to deliver bathroom pods for two identical hospitals with separate delivery teams. The design of the pod was completed collaboratively with lead architect Marmon Mok as a single set of unit types for both hospitals. After design, the projects diverged as each delivery team required different scheduled deliveries to meet the sites’ needs. Durapods was able to concurrently deliver both projects on time and satisfy the needs of our client.

The floor plan for the building required back-to-back pods with sanitary risers between the units. Executing this meant the team needed to construct the units with near zero tolerance for points of connection in order to achieve the correct fit in the field.

Facility Type

Community Hospital

Building Size

605,000 sq. ft.

Pod Count

292 Pods

Timeframe

2025-2026

Project Partners

Owner

University Health

Architect

Marmon Mok
Construction Mgr
Turner and Layton
MEP Engineer
WSP

UHS Palo Alto / Retama

Durapods was given the unique opportunity to deliver bathroom pods for two identical hospitals with separate delivery teams. The design of the pod was completed collaboratively with lead architect Marmon Mok as a single set of unit types for both hospitals. After design, the projects diverged as each delivery team required different scheduled deliveries to meet the sites’ needs. Durapods was able to concurrently deliver both projects on time and satisfy the needs of our client.

The floor plan for the building required back-to-back pods with sanitary risers between the units. Executing this meant the team needed to construct the units with near zero tolerance for points of connection in order to achieve the correct fit in the field.

Facility Type

Community Hospital

Building Size

605,000 sq. ft.

Pod Count

292 Pods

Timeframe

2025-2026

Project Partners

Owner

University Health

Architect

Marmon Mok
Construction Mgr
Turner and Layton
MEP Engineer
WSP

Identifying challenges

Two Sites, Two Schedules

Engineering resolutions

One Design, Concurrent Delivery

See Prefab come to life.

Our Work

With experience from healthcare to hospitality we have the know how to handle your next project.