Michigan DTMB

Northville, Michigan

Consistent compliance across 231 pods.

231 fully integrated behavioral health bathroom pods, developed through a prevention-through-design framework built for high-acuity psychiatric care.

Michigan DTMB - New State Psychiatric Hospital

Durapods delivered 231 fully integrated behavioral health bathroom pods engineered through a prevention-through-design framework specific to high-acuity psychiatric care.

Rather than treating ligature resistance as a fixture selection exercise, the pods were developed as controlled environments. Concealed plumbing infrastructure, anti-tamper fastening systems, monolithic grab bar transitions, and vandal-resistant components were coordinated into a single manufactured assembly — eliminating exposed conditions, reducing field variability, and tightening tolerance control.

By moving behavioral health detailing upstream into fabrication, the project reduced onsite risk, improved quality control, and ensured consistent compliance across all 231 units.

Facility Type

State Hospital

Building Size

400,000 sq. ft.

Pod Count

231 Pods

Timeframe

2024-2025

Project Partners

Owner

The State of Michigan Department of Technology Management and Budget (DTMB)

Architect

Integrated Design Solutions, Architecture+
Construction Mgr
The Christman Company

Michigan DTMB - New State Psychiatric Hospital

Durapods delivered 231 fully integrated behavioral health bathroom pods engineered through a prevention-through-design framework specific to high-acuity psychiatric care.

Rather than treating ligature resistance as a fixture selection exercise, the pods were developed as controlled environments. Concealed plumbing infrastructure, anti-tamper fastening systems, monolithic grab bar transitions, and vandal-resistant components were coordinated into a single manufactured assembly — eliminating exposed conditions, reducing field variability, and tightening tolerance control.

By moving behavioral health detailing upstream into fabrication, the project reduced onsite risk, improved quality control, and ensured consistent compliance across all 231 units.

Facility Type

State Hospital

Building Size

400,000 sq. ft.

Pod Count

231 Pods

Timeframe

2024-2025

Project Partners

Owner

The State of Michigan Department of Technology Management and Budget (DTMB)

Architect

Integrated Design Solutions, Architecture+
Construction Mgr
The Christman Company

Identifying challenges

High-Acuity Behavioral Health Risk

Engineering resolutions

Prevention Through Design, Built Upstream

See Prefab come to life.

Our Work

With experience from healthcare to hospitality we have the know how to handle your next project.