Cleveland Clinic Neurological Institute

Cleveland, OH

Designed for two bathrooms in a single pod.

Unique pod solutions met the team’s design intent, from double ICU pods to integrated patient lifts.

Flagship Neurological Institute

Durapods is providing 175 prefabricated bathroom pods for Cleveland Clinic’s new flagship Neurological Institute in Cleveland, Ohio, a 1-million-square-foot building that will be the largest structure on the Clinic’s main campus.

The pods span Med-Surg and ICU configurations. Each ICU pod is fabricated as two adjacent ICU bathrooms, and the 10th-floor med-surg pods include an integrated patient lift system.

Facility Type

Hospital

Building Size

1,000,000 sq. ft.

Pod Count

175 Pods

Timeframe

2024-2026

Project Partners

Owner

Cleveland Clinic

Architect

Stantec Architecture Inc.
Construction Manager
Turner Construction Company
MEP Engineer
Stantec Architecture Inc.
Karpinski Engineering

Flagship Neurological Institute

Durapods is providing 175 prefabricated bathroom pods for Cleveland Clinic’s new flagship Neurological Institute in Cleveland, Ohio, a 1-million-square-foot building that will be the largest structure on the Clinic’s main campus.

The pods span Med-Surg and ICU configurations. Each ICU pod is fabricated as two adjacent ICU bathrooms, and the 10th-floor med-surg pods include an integrated patient lift system.

Facility Type

Hospital

Building Size

1,000,000 sq. ft.

Pod Count

175 Pods

Timeframe

2024-2026

Project Partners

Owner

Cleveland Clinic

Architect

Stantec Architecture Inc.
Construction Manager
Turner Construction Company
MEP Engineer
Stantec Architecture Inc.
Karpinski Engineering

Identifying challenges

Two Pod Types, Unique Requirements

Engineering resolutions

Double Pods and Integrated Lifts