Volumetric modular construction requires total synchronization from concept through final placement.
Stage 1 (Planning), project scope, budgets, and delivery schedules are established to align with overall jobsite timelines.
Stage 2 (Design/BIM Coordination & Rapid Prototyping) converts architectural intent into detailed 3D BIM models and physical mock-ups, allowing project teams to evaluate finishes in real time.
Stage 3 (Factory Assembly) shifts production to our manufacturing facility at 425 Stump Road, North Wales, PA, where permanent trades build pods in parallel with site work. Powered by parent company PDM Constructors, one of the country’s largest carpentry contractors, every pod undergoes rigorous quality checks.
Stage 4 (Crane Jobsite Delivery) coordinates logistics to hoist finished pods directly into building structures.
Stage 5 (Turnkey Installation) completes MEP tie-ins, delivering fully operational units instantly. This process backed major builds like Wexner Medical Center (740+ pods), Penn Medicine Patient Pavilion, Penn State Health Hampden, Inspira Medical Center, and Four Seasons Philadelphia.